Team Swole. ๐ช
The Infrastructure team will be doing all the heavy stuff.
Consult the operating plan for exact details.
Setup: Set up tents, move tables, deliver boxes and equipment.
Strike: Take down tents, move tables back, return boxes and equipment to the truck.